Pular para o conteúdo

HORNBY DETAILED KIT BUILT BR 4-6-2 CLASS A4 LOCOMOTIVE 60022 MALLARD od

  •  

HORNBY OO GAUGE for 2 Rail Operation. UN BOXED VERY GOOD USED This tender drive locomotive has had extra detail added and a coat or varnish over the shell. Running lamps, buffer detail and loco crew have been added. The tender coupling has been removed and exchanged for a scale hook and link type. A great item for your collection. See pictures for details. Thanks for looking.

DJH PC MODELS EM GAUGE KIT BUILT LNER A4 MALLARD LOCO & 10 GRESLEY COACH oj

  •  

EM GAUGE for 2 Rail Operation on 18.5mm wide track. This is a professionally made set to represent the London King’s Cross to Glasgow train. The locomotive has been made from a white metal kit by DJH or similar. Fitted to a Comet chassis with and powered by a Portescap RG4 motor with fine gearing. This is a professionally assembled and painted rake of coaches from Comet Models or similar. They have etched brass sides with a plastic roof and a brass chassis with Comet bogies. All coaches have fully detailed interiors and chassis. The Coach roofs have been lightly weathered and there may be the odd light mark. A fabulous matched Coach set to run with the locomotive. Due to value I would like payment by direct bank transfer of for international Byers by IBAN transfer. Please respect this i.

BACHMANN 31-957 RE NAMED BR 4-6-2 CLASS A4 LOCOMOTIVE 60022 MALLARD BOXED oj

  •  

BACHMANN OO GAUGE for 2 Rail Operation. MINT BOXED PERFECT This un run locomotive has been professionally re named and re numbered from a Seagull base locomotive. Fitted with etched brass name plates. Comes in a good box with sealed detailing parts and instructions. A great item for your collection. See pictures for details. Thanks for looking.

Hornby RailRoad LNER, A4 Class, 4-6-2, 4468 ‘Mallard’ – Era 3

  •  

In May 1933, the German State Railways diesel-electric Fliegende Hamburger entered service, running for extended periods at 85mph. By 1934, in the USA, Burlington Zephyr had reached I I 2. A series of trials were conducted to confirm the Al’s suitability.