Kato 176-2140 N Santa Fe Yellowbonnet EMD F7A Unit Locomotive #330 – (F) #13E
Kato 176-2140 N Santa Fe Yellowbonnet EMD F7A Unit Locomotive #330 – (F) #13E in great condition. Slight scratches on plastic container.
Kato 176-2140 N Santa Fe Yellowbonnet EMD F7A Unit Locomotive #330 – (F) #13E in great condition. Slight scratches on plastic container.
DCC equipped. Dual mode DC and DCC operation. Supports all DCC programming modes. 6 DCC function outputs available and all can be function mapped individually. Built by Baldwin in the 1940s, the VO-1000 diesel locomotives could be found in both yard and mainline service across the country.
At the height of cab units, this was ALCOs foray into the market. Over 600 were built from 1946 to 1956 with 400 of them being FA units. DC operation. Crisp painting. Accurate lettering. Finely detailed body.
At the height of cab units, this was ALCOs foray into the market. Over 600 were built from 1946 to 1956 with 400 of them being FA units. Sound Ready with factory installed speaker (sound decoder not included).
At the height of cab unit popularity, this was ALCO’s foray into the market. Over 600 units were build from 1946 to 1956; 400 of them being FA’s. Model: ALCO FA-1 Diesel Locomotive. Finely painted and lettered.
Model: EMD GP39-2 Phase 1 Diesel Locomotive. The largest original fleet of GP39-2s was assembled by the Santa Fe who, over the course of seven years, acquired a total of 106 units. DCC Sound equipped.
Die-cast hood and chassis for improved pulling performance. Fine scale detailing. Fine scale handrails. Exceptional painting and printing. Directional LED lighting.
Master Line. Golden-white LEDs. Directional lighting. Dual brass flywheels.
DCC equipped. Dual mode DC and DCC operation. This was the stylized RS-2, keeping similar features as the RS-1 with the long car body and short front nose while also coming with many upgrades. Dynamic brake detailing.
These locomotives were manufactured by General Motors Electro-Motive Division of La Grange, Illinois. The locomotives were built between February 1939 to December 1949. Stealth Series. DC operation.